P-201 / Commercial / Portside
Harbour Tower
- Client
- Portside Estates
- Value
- $94M
- Duration
- 26 months
- Handover
- 2 weeks early
Fig. 02 — South elevation, 1:500
Fig. 03 — Structure model
The brief
Portside Estates wanted a flagship office building on a tight harbour plot: soft ground, a live road on two sides and a deadline tied to an anchor tenant’s lease.
The challenge
- Reclaimed land with groundwater two metres below the surface
- No space for material storage on site
- Traffic and noise limits from the port authority
Our solution
We designed a piled raft foundation with a secant-pile wall, prefabricated the steel frame off-site and delivered it just-in-time at night. A digital twin of the building tracked every element from factory to final bolt.
Two weeks early. Zero lost-time incidents. 310 people on site at peak.
Results
- Handed over 14 days ahead of programme
- 3.2% under the agreed budget
- 94% of site waste recycled