A-001 / General contractor since 1998

We build what others draw.

1,240 projects / 28 years

Offices, homes, schools and bridges — designed, engineered and built by one team, from the first survey to the last bolt.

Fig. 01 — Harbour Tower, level 07

28.0 m
Commercial+Residential+Infrastructure+Industrial+Education+Healthcare+

P-200 / Selected work

Built, signed, handed over.

All projects

B-250 / Scroll to build

Watch it rise.

  1. 01FoundationPiles, raft slab and the ground floor.
  2. 02FrameSteel and concrete, one floor every nine days.
  3. 03FacadeGlazing and cladding close the building in.
  4. 04HandoverTesting, snagging and the keys.

Fig. 04 — Construction sequence

1,240

projects delivered

98%

on-time handover

420

engineers & crew

2.4M

m² built

M-300 / Method

From survey to keys.

  1. 01

    WEEK 1–2

    Survey & brief

    Site visit, soil tests and a fixed-scope brief you sign off.

  2. 02

    WEEK 3–8

    Design & engineer

    Drawings, structural calcs, permits and a locked budget.

  3. 03

    MONTH 3–14

    Build

    Weekly site reports with photos, costs and the schedule.

  4. 04

    HANDOVER

    Keys & care

    Snagging, documentation and a 10-year structural warranty.

H-400 / Health & safety

Everyone goes home safe.

ISO 45001 certified, daily toolbox talks and a safety officer on every site. It’s the first line of every schedule we write.

Live site counter

1,284

days without a lost-time incident

They finished the school two weeks early, under budget, and the site was cleaner than our office.

Helen Ortiz — Facilities Director, Northfield School District

Q-001 / Start a project

Got a site? Let’s build on it.

Send us your drawings or just an idea. A project manager will call you back within one working day with a first estimate.